Perspex Distribution Ltd

Perspex Distribution Ltd

GRW have just carried out a full fit out on the new warehouse and production centre in Leeds 9 Industrial Estate.

Full design and installation service with LED lighting throughout including three phase power distribution for laser cutting machine facility and full dust control extraction and ventilation.

The project also included access control, CCTV and UTP CAT6 cabling infrastructure. The project was handed over with full documentation and we are proud to be associated with this prestigious site.