Leeds Graphic Press

GRW was awarded the contract to help relocate to a new print production facility with full design and installation of all Mains, Sub Mains Power Distribution, Load Assessment and Energy Cost Reduction throughout the production and the print areas.

The project included full Fire Alarm, Emergency Lighting, CAT6 UTP Cabling with dado trunking throughout with general power and clean UPS power through the general offices and print design facility.